Setup landing gear legs on drill press with leveling stand supporting the far end. Near end clamped in vise. Using drill marks set with axles assemblies on air-frame, drilled half way through diameter with a 1/8" HSS-Co bit. Took time to not heat the drill bit, using Boelube wax as a cutting oil. Turned leg to mark on reverse side to complete through hole. Both leg holes broke through from reverse hole near the center, resulting in centered 1/8" pilot hole through gear legs.